pt;font-family:" arial","sans-serif";color:black"="" lang="EN-US">Peace River Steelworks
finishes building the new tunnel Cuitiva by 1974, with a discharge capacity
greater than that of the old tunnel. In
early 1975, the deviation Inderena provisionally Olarte river to continue
suminsitrando Lake water diversion works Cuitiva and avoid lack of water
resources in the drought product between 1973 and 1975